![gujarat high court](https://www.scconline.com/blog/wp-content/uploads/2023/05/gujarat-high-court-1-440x293.webp)
[Gujarat Wind-Solar Hybrid Power Policy] Gujarat HC issues Notice to Energy and Petrochemicals Department in Extension of Policy case
The Gujarat Wind Solar Hybrid Power Policy, 2018 is set to expire on 19-06-2023.
The Gujarat Wind Solar Hybrid Power Policy, 2018 is set to expire on 19-06-2023.